Skip to content
Solar Stash
Leeds, West Yorkshire

Solar panels and batteries in Leeds

Our home city. Back-to-backs in Armley and Harehills, 1930s semis from Roundhay to Moortown, stone villas in Headingley, new estates at Thorpe Park and Allerton Bywater. The right system for each one starts with a free survey.

Call 07442 511817
Council
Leeds City Council
Planning authority for Leeds. Roof solar is usually permitted development; the survey checks.
Warm Homes: Local Grant
Funding allocated
Lower-income homes only (income of £36,000 or less, or benefits, EPC D to G). Most owner-occupiers will not qualify; 0% VAT is the lever for everyone.
What a 3.5 kW system makes here
About 2,678 kWh a year
850 kWh per kWp (PVGIS) on a typical roof. Worth 26.32p a unit when you use it, about 8p when you export it.
Leeds roofs

Solar on Leeds homes: what we see and what fits

Leeds has more back-to-back terraces than any city in Britain, mostly in Armley, Harehills, Beeston, Holbeck and Burley. A back-to-back has one roof pitch facing the street, so the question is simply which way that pitch faces: a south, east or west slope takes six to eight panels, roughly 2.5 kW, and a north-facing one usually does not pay. Through-terraces in Kirkstall and Bramley have two pitches, which doubles the options.

The 1930s semis along the Harrogate Road corridor, Roundhay, Moortown, Alwoodley, Oakwood and Chapel Allerton, are the easiest roofs in the city: a hipped or gabled pitch with eight to ten panels on the best face, a 3.5 kW system, and a loft or garage wall for a 5 kWh battery. The larger detached houses in Adel, Shadwell and Scarcroft often carry 4 kW or more and are where a bigger battery and an EV charger make sense together.

The new-build estates at Thorpe Park, Allerton Bywater, Micklefield and Kippax have simple, wide trussed roofs and modern consumer units, so the install is usually a single day with no electrical upgrade. Many already have an EV charger or a heat pump on the drawing, and the battery is sized with that in mind rather than for the house as it is today.

Conservation areas and listed buildings in Leeds

Leeds has more than 70 conservation areas, including Headingley, Far Headingley, Roundhay, Chapel Allerton, Horsforth and the centres of Wetherby and Otley. Roof-mounted solar is still usually permitted development inside a conservation area as long as it does not face the highway on a principal elevation, and listed buildings always need consent. The installer checks this at the survey, before anything is ordered.

Grants in Leeds: Leeds City Council and the Warm Homes: Local Grant

Leeds City Council has £5.96 million of Warm Homes: Local Grant funding, delivered by Sustainable Building Services and Groundwork Yorkshire. It is for households with an income under £36,000 or on income-related benefits (or in selected postcodes) with an EPC of D to G, and the council appoints its own installers. If you look eligible we will tell you; the contact is homeenergyhelp@leeds.gov.uk (as of 3 November 2026).

Check eligibility on GOV.UK or the Leeds City Council website. For everyone else: 0% VAT on solar panels and batteries until 31 March 2027, then 5% from 1 April 2027. Full detail on the VAT deadline page.

Call 07442 511817

Postcodes covered

  • LS1
  • LS2
  • LS3
  • LS4
  • LS5
  • LS6
  • LS7
  • LS8
  • LS9
  • LS10
  • LS11
  • LS12
  • LS13
  • LS14
  • LS15
  • LS16
  • LS17
  • LS18
  • LS19
  • LS20
  • LS21
  • LS22
  • LS23
  • LS25
  • LS26
  • LS27
  • LS28

Surveyed, quoted and fitted by a local MCS-certified installer. Booked from our office on King Street, Leeds.

What we arrange in Leeds

Worth reading first

Nearby

Part of our West Yorkshire coverage. Check any postcode on the areas page.

Around Leeds

Pudsey, Horsforth, Morley, Garforth, Wetherby, Otley

The same free survey and the same local installer. What changes is the roof.

Solar panels in Pudsey

Pudsey and Farsley (LS28) are mostly stone terraces and 1960s semis on a ridge between Leeds and Bradford, which means a lot of south-facing roofs with clear sky. The stone-slate roofs on the older terraces are heavier and the installer checks the rafters before confirming panel count.

Solar panels in Horsforth

Horsforth (LS18) mixes a conservation-area village centre with large 1930s semis and detached houses off Broadway and the Outer Ring Road. Inside the conservation area the installer keeps panels off any pitch that faces the road; most houses have a rear pitch that works.

Solar panels in Morley

Morley (LS27) has stone terraces round the town centre, inter-war semis along Fountain Street and Churwell, and newer estates towards Tingley and Gildersome. A typical semi takes a 3.5 kW system; terraces depend on which way the single pitch faces.

Solar panels in Garforth

Garforth (LS25) and the villages to the east, Kippax, Micklefield, Allerton Bywater, are largely post-war and new-build housing with wide, simple roofs and modern wiring. These are among the quickest installs in the city and the easiest to size a battery for.

Solar panels in Wetherby

Wetherby (LS22) and Boston Spa (LS23) have a conservation-area town centre, large stone houses and a lot of 1970s to 1990s detached housing on the edges. Bigger roofs and bigger bills: a 4 kW system with a 10 kWh battery is common here where there is an EV or a hot tub.

Solar panels in Otley

Otley (LS21) sits in the Wharfe valley with a historic town centre, stone terraces on the hillsides and newer estates on the south side. The valley sides mean some roofs face north; the survey checks the pitch before quoting, so nobody pays for panels that will not perform.

Straight answers

Questions from Leeds

10 questions people in Leeds ask. For anything else, the number at the top reaches a person who can answer it.

Who installs solar panels in Leeds through Solar Stash?
A local MCS-certified installer we work with in West Yorkshire. Solar Stash takes your enquiry from the Leeds office, calls you back to check your home suits solar, and books the free survey. The installer surveys, gives you a fixed written quote and fits the system, and your quote names the installer and its MCS number.
Is there a solar grant in Leeds?
Not for most homes. Leeds City Council has £5.96 million of Warm Homes: Local Grant funding for lower-income households with an EPC of D to G, delivered through the council’s own appointed installers, and the contact is homeenergyhelp@leeds.gov.uk (as of 3 November 2026). Everyone else gets 0% VAT until 31 March 2027 and the Smart Export Guarantee, which pays you for what you export.
When does 0% VAT on solar end in Leeds?
0% VAT on solar panels and batteries ends on 31 March 2027 and the rate is 5% from 1 April 2027. The rate follows the invoice date, so the system needs to be installed and invoiced before 31 March 2027. Paying a deposit does not lock the 0% rate on the balance.
Does solar work on a Leeds back-to-back?
Often, yes, if the single roof pitch faces south, east or west. A back-to-back takes six to eight panels, about 2.5 kW, which makes roughly 1,900 kWh a year at the West Yorkshire yield of 850 kWh per kWp. If the pitch faces north we say so at the survey rather than quote.
Do you cover Pudsey and Farsley?
Yes, LS28 is part of our Leeds coverage. Pudsey roofs are often a good fit because the ridge gives clear south-facing pitches; the free survey confirms how many panels yours takes.
Can I have solar in Horsforth conservation area?
Usually, yes. Roof solar is permitted development in a conservation area unless it sits on a principal elevation facing the road, and most Horsforth houses have a rear or side pitch that avoids that. Listed buildings need consent. The survey confirms it for your house.
Do you install solar in Morley and Churwell?
Yes. LS27 is covered from the Leeds office and the same local MCS-certified installer surveys and fits. Most Morley semis take 8 to 10 panels on the best pitch.
Is Garforth good for solar?
The roofs usually are: wide trussed pitches, few chimneys, modern consumer units. Expect 3.5 to 4 kW on a semi or detached house and a one-day install. The survey confirms the number for your roof.
Do you cover Wetherby and Boston Spa?
Yes, LS22 and LS23 are inside our area. Larger detached houses there often justify a bigger battery and the quote sizes it to your evening use, not to a package.
Do solar panels work in Otley with the hills?
On a south, east or west pitch, yes, the same as anywhere in West Yorkshire at about 850 kWh per kWp a year. On a steep north-facing valley roof we will say it does not stack up rather than quote. The free survey settles it.
Free survey, no obligation

Ready to see what solar could save on your home?

Five quick questions. We call back within one working day to check your home suits solar and book your free survey.

Or call us

07442 511817

Get your free quote

Is this for your home or your business?

Takes about a minute. We call back within one working day.

Call now